prospect-wiki Add Your Business
Minemax

Minemax Scheduler

Energy & Environment | Mining Software
  • Viewed - 65

Product Overview

Minemax Scheduler

Optimize all aspects of strategic mine scheduling in one run

Assess and maximize the NPV for projects and operations

Optimize schedules to meet mining, blending, processing and financial constraints

Analyze multiple economic, infrastructure and cut-off grade scenarios

Model multiple capital expansion scenarios

Optimize the economics of new mining projects

Optimize sequences for building your waste dumps

Optimize a large number of mine schedules in batches

Share schedules in different formats or use our free viewer software

Create audit reports for non-planners to confirm workability.

Specifications

LOM NPV scheduling

Create optimal practical LOM mine plans that meet all your project constraints.

Cut-over and cut-off destination scheduling

Jointly optimize cut-off and cut-over grades with the mine schedule, providing even more business value.

Process plant selection

Determine the type and capacity of your process plants.

Truck fleet selection

Determine the type and size of your trucks while respecting their limited life span.

User-defined reporting and export options

Enjoy the flexibility to provide the right information to the right people.

Waste dump sequence optimization

Integrate your mine schedule and waste dumping in one optimization.

Stockpiling and reclaiming

Add even more value with automated stockpiling and reclaiming.

Mining, processing, blending and financial constraints

Create a realistic strategic mine plan that satisfies mining, processing, blending and financial constraints.

Blending

Constrain attributes and material types to optimize recovery.

Batch optimization

Automate your workflow to operate efficiently.

Capital expenditure options

Simultaneously optimize mine schedules with multiple capex decisions.

64-bit parallel MILP optimization

Faster solve times to act on results quicker. Evaluate more scenarios to make better project decisions.

Time-delayed Leach Processing

Accurately model time-delayed leach recoveries and avoid tedious manual post-processing.

Integration to Detailed Mine Planning

Easily transition from your strategic plan to a detailed plan in Tempo

Product Reference

Add Review

Quality
Facilities
Price
Service
Your Score

Location

Location for : Listing Title