Product Overview
Tempo
Generate practical mine plans that follow your strategic plans
Create block-based and polygon-based schedules that respect trucking capacity
Achieve mining, processing and blending constraints in your schedule
Maximize retained value in transitioning from your strategic plan to your detailed plan.
Specifications
Fast block and polygon scheduling
Develop practical block- and polygon-based schedules that meet your project constraints
Automated scheduling
Avoid the tedium of manually generating and evaluating schedules with fully automated scheduling
Haulage
Model and constrain your truck fleet to develop a detailed practical plan respecting trucking requirements
Stockpiling and Reclaiming
Add even more value with automated stockpiling and reclaiming
Flexible precedences generation
Streamline precedence generation with flexible options from simple automated setup through to advanced digitized dig lines
Mining, processing and blending constraints
Create a schedule that is practically achievable and satisfies mining, processing and blending constraints
Multiple scheduling engine options
1. Very fast scheduling engine using the Bienstock-Zuckerberg (BZ) algorithm
2. Optimal NPV scheduling using the same 20-year industry-proven MILP optimization technology found in Minemax Scheduler (polygon models only)
Versatile reporting and exporting
Provide the right information to the right people with flexible reporting dashboards and exporting options
Minemax Scheduler Integration
Easily transition from your strategic plan to a detailed plan through seamless integration with Minemax Scheduler
Detailed waste dump scheduling
Import waste dump designs to integrate mine and waste dump scheduling for more accurate haulage and associated costs.